Skip to content

PRODUCT PROFILE / Integrated Manipulation

Zeus 4

Exact model / version: Zeus 4

Agile RobotsProducts checked: Source-reported stage: China website display; configuration can be customized

Selected Product Technical Facts

  • Identity and scope: Mobile robot system for power-sector inspection and operation, displayed with customizable configurations on the China website. Product page.
  • Evidence limit: The supplied record does not establish a particular customization, task result or operating/safety envelope.

Company Integration & Application Notes

Source-disclosed interfaces: Diana 7 has controller Modbus-TCP/TCP/IP/RS232 and source-announced FCI support; Thor 7 Pro has controller TCP/IP/Modbus-TCP/RS232; the Tekken D base configuration uses RS485/Modbus RTU. A shared protocol name, group affiliation or placement on the same website is not evidence that two products connect directly. Diana 7, FCI announcement, Thor 7 Pro, Tekken D.

System validation still required: Confirm mechanical mounting, tool-power budget, communication roles/registers/API, version matching, real-time behavior, emergency-stop/safety circuits, actual load and acceptance tests for the delivered system. For Diana 7 Med, obtain current product authorization and intended-use/region evidence separately. IEC 60601-1 / IEC 60601-1-2 statements on a product page do not replace applicable registration or model-specific certification evidence. Diana 7 Med.

Configuration and attribution boundary: Keep Tekken D, Tekken D+ VT10-G and the independent VT10-G record separate. Group-site Agile Hand and AgileCore are not attributed as Beijing-manufactured products. Quotation, manufacturing location, contracting entity, delivery batch and after-sales responsibility require procurement documents, not inference from a website footer. Thor 20's China listing and group Coming soon status must both be considered. Tekken configurations, Independent sensor, Thor 20, Group Thor series.

Before You Evaluate or Order

  1. Specify the exact customized Zeus 4 inspection and operation configuration in the proposal.
  2. Request evidence for the intended inspection payload, tools and operating/safety envelope.
  3. Agree site commissioning, task acceptance and recovery procedures for that configuration.

These points require confirmation for your intended purchase and application. Missing public information does not imply a product deficiency.

Official Resources