Skip to content

PRODUCT PROFILE / Sensing & Perception

Hera

Exact model / version: Hera

Agile RobotsProducts checked: Source-reported stage: China website display; no manipulation capability inferred from this listing

Selected Product Technical Facts

  • Identity and scope: Rail-mounted inspection robot displayed on the China website. Product page.
  • Evidence limit: No detailed rail, sensing-payload or operating-environment parameter set is supplied. The inspection listing does not establish manipulation capability.

Company Integration & Application Notes

Source-disclosed interfaces: Diana 7 has controller Modbus-TCP/TCP/IP/RS232 and source-announced FCI support; Thor 7 Pro has controller TCP/IP/Modbus-TCP/RS232; the Tekken D base configuration uses RS485/Modbus RTU. A shared protocol name, group affiliation or placement on the same website is not evidence that two products connect directly. Diana 7, FCI announcement, Thor 7 Pro, Tekken D.

System validation still required: Confirm mechanical mounting, tool-power budget, communication roles/registers/API, version matching, real-time behavior, emergency-stop/safety circuits, actual load and acceptance tests for the delivered system. For Diana 7 Med, obtain current product authorization and intended-use/region evidence separately. IEC 60601-1 / IEC 60601-1-2 statements on a product page do not replace applicable registration or model-specific certification evidence. Diana 7 Med.

Configuration and attribution boundary: Keep Tekken D, Tekken D+ VT10-G and the independent VT10-G record separate. Group-site Agile Hand and AgileCore are not attributed as Beijing-manufactured products. Quotation, manufacturing location, contracting entity, delivery batch and after-sales responsibility require procurement documents, not inference from a website footer. Thor 20's China listing and group Coming soon status must both be considered. Tekken configurations, Independent sensor, Thor 20, Group Thor series.

Before You Evaluate or Order

  1. Request Hera's rail, drive, inspection-payload and controller configuration for the intended installation.
  2. Confirm rail/site interfaces, environmental limits and the inspection data/output requirements.
  3. Agree coverage, inspection and recovery acceptance tests without assuming a manipulation function.

These points require confirmation for your intended purchase and application. Missing public information does not imply a product deficiency.

Official Resources