Skip to content

PRODUCT PROFILE / Integrated Manipulation

FIP

Exact model / version: FIP

Agile RobotsProducts checked: Source-reported stage: Named automation platform; hardware revision unspecified; solution-configured

Selected Product Technical Facts

  • Identity and scope: FIP is the named flexible robot operating/automation platform on the China website, configured as a solution. No hardware revision is specified. Product page.
  • Evidence limit: No detailed platform specification or validated third-party compatibility is established by the supplied record.

Company Integration & Application Notes

Source-disclosed interfaces: Diana 7 has controller Modbus-TCP/TCP/IP/RS232 and source-announced FCI support; Thor 7 Pro has controller TCP/IP/Modbus-TCP/RS232; the Tekken D base configuration uses RS485/Modbus RTU. A shared protocol name, group affiliation or placement on the same website is not evidence that two products connect directly. Diana 7, FCI announcement, Thor 7 Pro, Tekken D.

System validation still required: Confirm mechanical mounting, tool-power budget, communication roles/registers/API, version matching, real-time behavior, emergency-stop/safety circuits, actual load and acceptance tests for the delivered system. For Diana 7 Med, obtain current product authorization and intended-use/region evidence separately. IEC 60601-1 / IEC 60601-1-2 statements on a product page do not replace applicable registration or model-specific certification evidence. Diana 7 Med.

Configuration and attribution boundary: Keep Tekken D, Tekken D+ VT10-G and the independent VT10-G record separate. Group-site Agile Hand and AgileCore are not attributed as Beijing-manufactured products. Quotation, manufacturing location, contracting entity, delivery batch and after-sales responsibility require procurement documents, not inference from a website footer. Thor 20's China listing and group Coming soon status must both be considered. Tekken configurations, Independent sensor, Thor 20, Group Thor series.

Before You Evaluate or Order

  1. Request the FIP solution's exact hardware/software revision and bill of materials.
  2. Confirm which process equipment, robot interfaces and site-preparation work are included in the proposal.
  3. Agree task-output criteria and responsibility for system integration and commissioning.

These points require confirmation for your intended purchase and application. Missing public information does not imply a product deficiency.

Official Resources