Skip to content

PRODUCT PROFILE / Integrated Manipulation

Assessment Training Platform

Exact model / version: Assessment Training Platform

Agile RobotsProducts checked: Source-reported stage: Named training platform containing Diana 7; independent model/revision unspecified

Selected Product Technical Facts

  • Identity and scope: Named skills assessment training platform containing Diana 7. An independent platform model number or hardware revision is not specified. Product page.
  • Evidence limit: No complete delivered training-system specification is supplied. Inclusion of Diana 7 does not establish a particular curriculum, qualification or full-system acceptance result.

Company Integration & Application Notes

Source-disclosed interfaces: Diana 7 has controller Modbus-TCP/TCP/IP/RS232 and source-announced FCI support; Thor 7 Pro has controller TCP/IP/Modbus-TCP/RS232; the Tekken D base configuration uses RS485/Modbus RTU. A shared protocol name, group affiliation or placement on the same website is not evidence that two products connect directly. Diana 7, FCI announcement, Thor 7 Pro, Tekken D.

System validation still required: Confirm mechanical mounting, tool-power budget, communication roles/registers/API, version matching, real-time behavior, emergency-stop/safety circuits, actual load and acceptance tests for the delivered system. For Diana 7 Med, obtain current product authorization and intended-use/region evidence separately. IEC 60601-1 / IEC 60601-1-2 statements on a product page do not replace applicable registration or model-specific certification evidence. Diana 7 Med.

Configuration and attribution boundary: Keep Tekken D, Tekken D+ VT10-G and the independent VT10-G record separate. Group-site Agile Hand and AgileCore are not attributed as Beijing-manufactured products. Quotation, manufacturing location, contracting entity, delivery batch and after-sales responsibility require procurement documents, not inference from a website footer. Thor 20's China listing and group Coming soon status must both be considered. Tekken configurations, Independent sensor, Thor 20, Group Thor series.

Before You Evaluate or Order

  1. Request the complete platform configuration, including the supplied Diana 7 variant, tooling and software.
  2. Confirm which training/assessment functions, course materials and installation work are included.
  3. Agree full-system acceptance and support responsibilities rather than relying only on the arm's specifications.

These points require confirmation for your intended purchase and application. Missing public information does not imply a product deficiency.

Official Resources