Skip to content

PRODUCT PROFILE / Integrated Manipulation

AMR350-01

Exact model / version: AMR350-01

Agile RobotsProducts checked: Source-reported stage: China product page names AMR350-01; menu uses AMR

Selected Product Technical Facts

  • Identity and scope: Mobile manipulation robot with AMR350-01 named on the product page; the China menu uses AMR. Product page.
  • Evidence limit: No detailed mobility, arm, payload or integration parameter set is supplied. The model name is not interpreted as a payload rating.

Company Integration & Application Notes

Source-disclosed interfaces: Diana 7 has controller Modbus-TCP/TCP/IP/RS232 and source-announced FCI support; Thor 7 Pro has controller TCP/IP/Modbus-TCP/RS232; the Tekken D base configuration uses RS485/Modbus RTU. A shared protocol name, group affiliation or placement on the same website is not evidence that two products connect directly. Diana 7, FCI announcement, Thor 7 Pro, Tekken D.

System validation still required: Confirm mechanical mounting, tool-power budget, communication roles/registers/API, version matching, real-time behavior, emergency-stop/safety circuits, actual load and acceptance tests for the delivered system. For Diana 7 Med, obtain current product authorization and intended-use/region evidence separately. IEC 60601-1 / IEC 60601-1-2 statements on a product page do not replace applicable registration or model-specific certification evidence. Diana 7 Med.

Configuration and attribution boundary: Keep Tekken D, Tekken D+ VT10-G and the independent VT10-G record separate. Group-site Agile Hand and AgileCore are not attributed as Beijing-manufactured products. Quotation, manufacturing location, contracting entity, delivery batch and after-sales responsibility require procurement documents, not inference from a website footer. Thor 20's China listing and group Coming soon status must both be considered. Tekken configurations, Independent sensor, Thor 20, Group Thor series.

Before You Evaluate or Order

  1. Confirm the AMR350-01 mobile-base, arm, end-effector and controller configuration in the quotation.
  2. Request mobility/manipulation limits, site requirements and control/safety interface documents.
  3. Agree navigation and manipulation acceptance tests for the real route, workspace and objects.

These points require confirmation for your intended purchase and application. Missing public information does not imply a product deficiency.

Official Resources